Grab hire and muck away
Have loose soil, rubble or excavation spoil ready to remove? Grab hire, often called muck away for excavation waste, combines mechanical loading and collection where the material and site are suitable.

When grab hire can help
It can suit excavation, landscaping and driveway work where material is gathered within reach of a suitable loading position. If waste is being produced over several days, or includes other materials, a skip may be a better option.
Soil removal, rubble and excavation spoil
Describe soil and stones, concrete, bricks or broken paving separately. Include where the material came from and any known contamination or available classification information. Clean-looking soil is not proof that a load can be accepted.
Muck away here means collection of agreed excavation material. It does not include digging, supplying aggregates or clearing every type of mixed building waste. The supplier confirms acceptance and the collection arrangement.
Describe the material
Tell us whether you have soil, stones, concrete, bricks or broken paving. Describe separate piles individually and explain where the waste came from. Mention mixed materials or known contamination; we may need more information before a collection can be agreed.
Show us the access
Send photos of the entrance, turning space, pile and proposed lorry position. Include approximate distances, gate widths, slopes and overhead obstacles. A pile being close to the road does not by itself confirm that it can be loaded.
What affects the quote?
- Material type and estimated quantity.
- Collection postcode and available vehicles.
- Loading access, time on site and the number of visits.
- Disposal requirements and any additional information about the material.
Questions customers ask
How far can the grab reach?
It depends on the vehicle and layout. Send photos and approximate distances so the supplier can assess your site.
Can you take mixed building waste?
List every material. We’ll check what can be accepted and whether a skip or separate collection would suit the job better.
Is there a fixed amount in one load?
Vehicle capacity, weight limits and the material all matter. The quote should state the allowance and how extra loads are charged.
Do I need to move the pile first?
Show us its current position before moving it. Agree the loading arrangement before gathering material somewhere the lorry may not be able to reach.
